Layout Update – Apr 2011 – N Gauge

Share it with your friends Like

Thanks! Share it with your friends!

Close

Progress from the layout/train set. All the street buildings have been built, they’re all low relief Metcalfe card kits and have been modified with interior details from Scalescenes.com All the buildings can and will be illuminated with LED’s.

We recommend this site to visit Hornby Railways

Most of the work has been done to get the street in place but first I’ll need to paint the road before fixing the buildings down. I’d like to buy some working street lights once I have the money for them.
All of this needs to be completed before the tunnel portals and embankment are in place so I can work on the wiring from the front.

Windows Movie Maker no longer accepts the video format direct from my camera, for some unknown reason, so I’m having to convert it to edit it. Apologies if the quality is poor.

Thanks for watching.

Comments

Write a comment

*

*********COMPENSATION DISCLOSURE******** Unless otherwise expressly stated, you should assume that the links contained on this site may be affiliate links and the author will earn commission if you click on them and buy the product / service mentioned in this post. We recommend this site to visit Hornby Railways

Many Thanks For Visiting Our Video Blog. ***** Share The Love!

CONTACT US*****DISCLAIMER*****DMCA*****PRIVATE-POLICY*****TERMS